LOT (2) TRIWALLS OF MAINTENANCE ITEMS, BATCH LOT, INCLUDES: METAL HOSE ASSEMBLY, METAL TUBE ASSEMBLY, SIGNAL HORN, CENTRIFUGAL FAN, LIQUID FUEL WATER SEPERATOR, AND MORE, NO SCREENING PERMITTED
1 Triwall \& 1 Pallet Aerospace \& Hardware Components: Multiple item lot. For specific lot information, reference Item Manifest data in the Lot Details tab below. For Lot size and weight information, reference the Shipping Details tab below.
21 pallets of FSG 53s to include Hardware and Abrasives For specific lot information and approximate quantities, reference Item Manifest data in the Lot Details tab below. For Lot size and weight information, reference the Shipping Details tab below. Trailer load equals 21 pallets apprx 12,000lbs
4 pallets FSG 53s to include Hardware and Abrasives For specific lot information and approximate quantities, reference Item Manifest data in the Lot Details tab below. For Lot size and weight information, reference the Shipping Details tab below.
Management Data - US Gov't supply management data (costs, storage, etc.)